The project objective was to ensure efficient railway traffic control between Mińsk Mazowiecki and Siedlce.
We installed computerized automatic, telecommunication and electric systems. During the project we introduced numerous advanced solutions in telecommunications and traffic control, including centralized train power control, digital transmission system, radio communication system and animal warning system.