Constructing the project
Scope of works:
- rebuilding 7,2 km
- excavations – 6.700 m3
- embankments – 6.700 m3
- stabilization – 2.650 m3
- crushed stone aggregate stabilized mechanically – 8.600 t
- bitumen mass – 32.200 t
- concrete kerbs– 16.300 m
- stone curbs – 1.400 m
- concrete block pavement – 4.300 m2
- boulder pavement – 1.700 m2
- geocomposite on widened roadway – 18.000 m2
- geocomposite on levelling – 9.000 m2
- lightening
- telecommunication engineering
- landslide removal
- water and sewerage supply networks
- gas supply networks
- traffic lights
- culverts
- bridge facilities (bridge and gangway)