Scope of works
- Demolition of buildings
- Reconstruction of the underground utilities such as: gas, water, sewer
- Construction of two flyovers: eastern 18,3 metres long and western 33 metres long
- Construction of the bridge with 132 metres span with total width of both road and pavement 20,4 metres
- Construction of access roads, pavements, bike paths and noise barriers
- Traffic lights and street lighting
- Small architecture elements, planting low greens on the route