c

Zwierzyniecki Bridge

Scope of works

  • Demolition of buildings
  • Reconstruction of the underground utilities such as: gas, water, sewer
  • Construction of two flyovers: eastern 18,3 metres long and western 33 metres long
  • Construction of the bridge with 132 metres span with total width of both road and pavement 20,4 metres
  • Construction of access roads, pavements, bike paths and noise barriers
  • Traffic lights and street lighting
  • Small architecture elements, planting low greens on the route
Last updated: 8/16/2017

Search or filter all our projects

Result

loading