c

Modernization of railway line E-30 between Wegliniec and Legnica

The project in figures

4 new switch towers modernized traffic control systems at 5 stations


Crossing systems with monitoring and remote control devices:
• 9 cat. A crossings
• 1 cat. E pedestrian crossing
Automatic highway crossing signaling:
• 21 B category crossings

Last updated: 8/16/2017

Search or filter all our projects

Result

loading