Constructing the project
Works included road way widening to 5.5 m and strengthening the paving to 100 kN/axis. We have renovated sidewalks, installed new barriers and road signs, strengthened the shoulders and rebuilt culverts under the road crown and exits. The investment also included straightening the turns and rebuilding of crossroad with local road in Krempna.
The renovated road section cuts through Wisłoka and Ryjak rivers. One of the key contract elements was modernization of four reinforced concrete bridges of 225 m length in total. We installed steel barriers on the bridges and dewatering system. We have strengthened the river and stream bed with stone strip on willow and gabions.
The project in figures
- road way width – 6.5 m
- sidewalk width – 3.5 m