c

Extension of road infrastructure for new investments in the area of Elblag

Constructing the project

Scope of works realized:

  • embankments: 178 872,4 m3
  • excavations: 126 910,0 m3
  • bitumen mass : 20 625 tons
  • surface of road lanes: 35 870m2
  • surface of walkways and bicycle paths: 21 140 m2
Last updated: 8/16/2017

Search or filter all our projects

Result

loading