Constructing the project
The investment covers three sections separated by intervals modernised within the scope of realization of other projects.
Scope of works:
1. Road and branch works:
* earthworks (excavations) - 33 000 m3
* earthworks (embankments) - 69 500 m3
* aggregate foundations stabilised with cement - 38 000 Mg
* foundations made of crushed stone aggregate - 36 000 Mg
* bituminous layers - 69 000 Mg
* concrete and stone kerbs - 37 000 m
* sidewalks and surfaces made of concrete blocks - 77 000 m2
* surfaces made of reinforced concrete slabs - 45 000 m2
* steel culverts - 65 sets
* rain and storm water sewerage system - 7 000 m
* telecommunication engineering - 3 200 m
* electric and power engineering works - 15 000 m
* traffic lights - 8 sets
* gas supply network - 400 m
* water supply network - 1 600 m
2. Bridge facilities - 3 sets
* rebuilding the bridge into a culvert over Kanał Młyński
* renovating the bridge over the Kłodawa river
* disassembly of the railway overpass