Constructing the project
Thanks to the investment realized by Skanska the object was extended by aquapark with numerous attractions as well as eight-course training pool 21 x 25 meters. The aquapark features recreation pool with varying depth 90 - 135 cm and an irregular oval shape with approximate dimensions 16 x 16 m. The pool is equipped with fountains, geysers, waterfalls, jacuzzi with water and air massages, reversible flows, whirlpools, "wild river flow" and immersed reflectors. The biggest attraction of the aquapark is a 104 meter long external slide which is the longest one in the whole Podkarpacie region. You can also enjoy 3 saunas and an oval children's pool with maximum depth 35 cm accompanied by a small fountain and a slide.
Construction works included replacement of roofing on the whole building and realization of new main entrance to the complex with an entrance hall housing ticket offices and dressing rooms. We also realized additional stands for 260 spectators and a mezzanine for gastronomic outlets accesible for both aquapark visitors and spectators.
The contract, apart from construction and assembly works included also the development of detailed design as well as technical specification for the purpose of realization and acceptance of works related to the extension of swimming pool hall and facilities.
The project in figures
- development area: 9,900 m²
- cubic capacity 73 000 m²
- water table area:
- sports pool: 525 m²
- recreation pool: 250 m²
- children's pool: 60 m² - roads, yards and sidewalks area: 7,5000 m²
- green areas: 6,200 m²