c

Kalamazoo/Battle Creek International Airport Terminal

  • New Airport Terminal
  • New Airport Terminal
  • New Airport Terminal
  • New Airport Terminal

This $35 million, 90,000-Square foot new terminal at Kalamazoo Battlecreek International Airport (AZO) included five passenger gates with enclosed elevated skybridges, two security lines, rental car space and cafeteria/dining space. The project was built directly adjacent to the fully operational existing terminal, and site logistics with trailers, laydown areas and storage were within a secured area of the air operations area (AOA). Close coordination with the airport and FAA was required during the replacement of the fiber optic infrastructure.

Last updated: 8/16/2017

Search or filter all our projects

All projects
  • All projects
  • Offices
  • Roads and bridges
  • Hydrotechnincs and ecology
  • Railways and trams
  • Cultural and monuments
  • Aviation
  • Life sciences
  • Industrial and logistics
  • Healthcare
  • Sports and recreation

Result

Sort by published date
  • Sort by published date
  • Sort by newest start date
  • Sort by newest completion date
  • Sort by oldest start date
  • Sort by name A-Z
  • Sort by name Z-A
loading