c

Combined Heat & Power Plant (CHP) System

  • Street view above CHP
  • CHP interior detail

$95 million replacement and expansion of an existing co-generation plant with a new 13.4 megawatt (MW) facility consisting of two gas turbine generators with boiler units (heat recovery steam generators) and switchgear within an underground vault.  The new facility feeds 11 substations, increasing electric service from 7 to 20 campus buildings and maintaining high temperature hot water service to 40 campus buildings.  Phases included utility relocations, such as 20-inch and 30-inch gas lines, water mains, sewer and existing electric vaults; vault construction; vault fit-out, electrical distribution and fuel tank modification.

Last updated: 8/16/2017

Search or filter all our projects

All projects
  • All projects
  • Offices
  • Roads and bridges
  • Hydrotechnincs and ecology
  • Railways and trams
  • Cultural and monuments
  • Aviation
  • Life sciences
  • Industrial and logistics
  • Healthcare
  • Sports and recreation

Result

Sort by published date
  • Sort by published date
  • Sort by newest start date
  • Sort by newest completion date
  • Sort by oldest start date
  • Sort by name A-Z
  • Sort by name Z-A
loading