Construction of multipurpose sports and entertainment arena in Łódź was realized in a couple of stages. First stage consisted in completing the solid structure of reinforced concrete ring supporting the roof dome. Next we carried out finishing works including bricks and plaster-cardboard partition walls, internal steel, aluminiuam and wood joinery as well as finishing works of brick and concrete walls and ceilings. The sports centre is adapted to organization of music events, therefore we installed special acoustic screen panels under the roof.
Scope of our works also included realization of electric and telecommunication installations and sanitary sewerage systems. Four wall screens 15 m² each and four sound systems 23 kW each were installed on a movable structure above the arena. The surface inside the arena was prepared in such a way so as to enable placement of mobile floors suited for various sports events (parquet, lining, etc.). Dehydration system installed in the arena enables preparation of ice panel. The object can house 10 000 spectators on permanent stands and additional 3 000 on movable stands sliding onto the pitch.